Summary
The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares.
The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising:
- cylindrical stack consisting of industrial size elementary cells (1,600 mm cell diameter)
- balance of plant (BOP)
- power electronics
- advanced communication & control system
In the early phase of the development process, great attention will be brought to the identification of end-user’s needs and relevant/critical operational requirements.
The target behaviour of the industrial prototype will be thoroughly demonstrated in an operational environment reflecting different on-grid integration schemes using power facilities already available to the Consortium (notably, 635 kW wind and 100 kW photovoltaic power plants).
As previously mentioned, the successful demonstration of the industrial prototype will be paving the way towards the implementation and the commercial deployment of the 4.5 T H2/day HP AWE technology in the frame of large scale demonstration projects which shall be the next step after the conclusion of ELYntegration.
The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising:
- cylindrical stack consisting of industrial size elementary cells (1,600 mm cell diameter)
- balance of plant (BOP)
- power electronics
- advanced communication & control system
In the early phase of the development process, great attention will be brought to the identification of end-user’s needs and relevant/critical operational requirements.
The target behaviour of the industrial prototype will be thoroughly demonstrated in an operational environment reflecting different on-grid integration schemes using power facilities already available to the Consortium (notably, 635 kW wind and 100 kW photovoltaic power plants).
As previously mentioned, the successful demonstration of the industrial prototype will be paving the way towards the implementation and the commercial deployment of the 4.5 T H2/day HP AWE technology in the frame of large scale demonstration projects which shall be the next step after the conclusion of ELYntegration.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/671458 |
Start date: | 01-09-2015 |
End date: | 31-05-2019 |
Total budget - Public funding: | 3 301 391,25 Euro - 1 861 309,00 Euro |
Cordis data
Original description
The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares.The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising:
- cylindrical stack consisting of industrial size elementary cells (1,600 mm cell diameter)
- balance of plant (BOP)
- power electronics
- advanced communication & control system
In the early phase of the development process, great attention will be brought to the identification of end-user’s needs and relevant/critical operational requirements.
The target behaviour of the industrial prototype will be thoroughly demonstrated in an operational environment reflecting different on-grid integration schemes using power facilities already available to the Consortium (notably, 635 kW wind and 100 kW photovoltaic power plants).
As previously mentioned, the successful demonstration of the industrial prototype will be paving the way towards the implementation and the commercial deployment of the 4.5 T H2/day HP AWE technology in the frame of large scale demonstration projects which shall be the next step after the conclusion of ELYntegration.
Status
CLOSEDCall topic
FCH-02.8-2014Update Date
26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
H2020-EU.3.3.8.3. Demonstrate on a large scale the feasibility of using hydrogen to support integration of renewable energy sources into the energy systems, including through its use as a competitive energy storage medium for electricity produced from renewable energy sources