UPWAVE | Demonstration of a 1-MW wave energy converter integrated in an offshore wind turbine farm

Summary
The aim is to develop and install a pre-commercial wave energy converter (WEC) of 1MW power, the WAVESTAR C6-1000 device, with main targets the device industrialization and the demonstration of wind and wave energy applications. The utility company Parkwind, which develops, builds and operates wind farms in the North Sea, is committed to the achievement of WAVESTAR’s next development stage. Parkwind provides the installation site with grid connection for the first full-scale WAVESTAR WEC, located within a Belgian offshore wind farm. The UPWAVE project consortium has been developed through the establishment of strong synergies and partnerships, by bringing together key European industrial players and European universities represented by wave energy experts whose overall objectives focus on:

1) Reduction of the device’s cost by introducing new design, components and materials. Cost optimization is achieved through new methods on deployment, installation, operation and maintenance.

2) Improvement of the energy efficiency by developing a more advanced Power Take Off based on a second generation digital hydraulic system and innovative control strategy.

3) Integration of wave energy converters in wind farms by considering the interaction between wave and wind devices in terms of operation, cost reduction and maximization of environmental benefits.

Public research programs, industrial cooperation and technology transfer from the offshore industry (offshore wind, oil and gas) ensure the development of manufacturing processes, automation and optimisation of the WAVESTAR C6-1000 WEC. New certificates and standards will be made available for the wave energy industry. After the completion of the UPWAVE project, the cost of wave energy will be significantly reduced to a level in line with the cost of offshore wind energy (around 15 c€/kWh). The WAVESTAR C6-1000 demonstrator device will lead to a commercial WEC and a hybrid renewable energy device (wind and wave).
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/691799
Start date: 01-02-2016
End date: 31-01-2021
Total budget - Public funding: 28 866 787,50 Euro - 20 722 489,00 Euro
Cordis data

Original description

The aim is to develop and install a pre-commercial wave energy converter (WEC) of 1MW power, the WAVESTAR C6-1000 device, with main targets the device industrialization and the demonstration of wind and wave energy applications. The utility company Parkwind, which develops, builds and operates wind farms in the North Sea, is committed to the achievement of WAVESTAR’s next development stage. Parkwind provides the installation site with grid connection for the first full-scale WAVESTAR WEC, located within a Belgian offshore wind farm. The UPWAVE project consortium has been developed through the establishment of strong synergies and partnerships, by bringing together key European industrial players and European universities represented by wave energy experts whose overall objectives focus on:

1) Reduction of the device’s cost by introducing new design, components and materials. Cost optimization is achieved through new methods on deployment, installation, operation and maintenance.

2) Improvement of the energy efficiency by developing a more advanced Power Take Off based on a second generation digital hydraulic system and innovative control strategy.

3) Integration of wave energy converters in wind farms by considering the interaction between wave and wind devices in terms of operation, cost reduction and maximization of environmental benefits.

Public research programs, industrial cooperation and technology transfer from the offshore industry (offshore wind, oil and gas) ensure the development of manufacturing processes, automation and optimisation of the WAVESTAR C6-1000 WEC. New certificates and standards will be made available for the wave energy industry. After the completion of the UPWAVE project, the cost of wave energy will be significantly reduced to a level in line with the cost of offshore wind energy (around 15 c€/kWh). The WAVESTAR C6-1000 demonstrator device will lead to a commercial WEC and a hybrid renewable energy device (wind and wave).

Status

TERMINATED

Call topic

LCE-03-2015

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.3. SOCIETAL CHALLENGES - Secure, clean and efficient energy
H2020-EU.3.3.0. Cross-cutting call topics
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2. Low-cost, low-carbon energy supply
H2020-EU.3.3.2.0. Cross-cutting call topics
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.1. Develop the full potential of wind energy
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.2. Develop efficient, reliable and cost-competitive solar energy systems
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.4. Develop geothermal, hydro, marine and other renewable energy options
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies