Summary
Although Italy has a great potential for biogas production, many non-technical barriers are still present in the current framework. Some of the limiting factors involve public acceptance of the biogas facilities diffusion, as well as lack of a reliable coordination between different stakeholders. Furthermore, normative and legislative inadequacies and deficiencies haven’t facilitated the implementation of these technologies within the national context.
The main project objective consists on the construction of a communicative model oriented to spread balanced information, based on environmental and economic benefits, between all the actors potentially involved in biogas/biomethane implementation. At the same time, actions will be focused on reducing the fragmentation between farmers, foresters and other stakeholders in order to reach the minimal facility dimension needed, increased biogas and biomethane penetration and reduce cost management.
A participatory process model will be developed as the main project’s approach to reduce social conflict and to include all actors in important common decision making process; starting from the experience, a normative proposal on the participatory process will be recommended.
The effectiveness of the proposal will be maximized applying the actions on specific and restricted areas: the study of the energetic unhatched potential deriving from anaerobic digestion of residual biomass or organic waste will constitute the starting point for communication and information campaigns toward the territory and its stakeholders. The attention will be focused on some high energetic potential regions where the diffusion of these technologies struggles to be realized and the effects of project actions on awareness and acceptance will be evaluated.
In particular, a specific decisional participative model will be implemented and applied in one of the selected districts, as case study, involving in an active way all the stakeholders.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/691875
Start date: 01-01-2016
End date: 30-06-2018
Total budget - Public funding: 1 480 535,00 Euro - 1 480 535,00 Euro
Cordis data

Original description

Although Italy has a great potential for biogas production, many non-technical barriers are still present in the current framework. Some of the limiting factors involve public acceptance of the biogas facilities diffusion, as well as lack of a reliable coordination between different stakeholders. Furthermore, normative and legislative inadequacies and deficiencies haven’t facilitated the implementation of these technologies within the national context.
The main project objective consists on the construction of a communicative model oriented to spread balanced information, based on environmental and economic benefits, between all the actors potentially involved in biogas/biomethane implementation. At the same time, actions will be focused on reducing the fragmentation between farmers, foresters and other stakeholders in order to reach the minimal facility dimension needed, increased biogas and biomethane penetration and reduce cost management.
A participatory process model will be developed as the main project’s approach to reduce social conflict and to include all actors in important common decision making process; starting from the experience, a normative proposal on the participatory process will be recommended.
The effectiveness of the proposal will be maximized applying the actions on specific and restricted areas: the study of the energetic unhatched potential deriving from anaerobic digestion of residual biomass or organic waste will constitute the starting point for communication and information campaigns toward the territory and its stakeholders. The attention will be focused on some high energetic potential regions where the diffusion of these technologies struggles to be realized and the effects of project actions on awareness and acceptance will be evaluated.
In particular, a specific decisional participative model will be implemented and applied in one of the selected districts, as case study, involving in an active way all the stakeholders.

Status

CLOSED

Call topic

LCE-14-2015

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.3. SOCIETAL CHALLENGES - Secure, clean and efficient energy
H2020-EU.3.3.2. Low-cost, low-carbon energy supply
H2020-EU.3.3.2.0. Cross-cutting call topics
H2020-LCE-2015-3
LCE-14-2015 Market uptake of existing and emerging sustainable bioenergy
H2020-EU.3.3.3. Alternative fuels and mobile energy sources
H2020-EU.3.3.3.1. Make bio-energy more competitive and sustainable
H2020-LCE-2015-3
LCE-14-2015 Market uptake of existing and emerging sustainable bioenergy
H2020-EU.3.3.7. Market uptake of energy innovation - building on Intelligent Energy Europe
H2020-LCE-2015-3
LCE-14-2015 Market uptake of existing and emerging sustainable bioenergy