Emerging technologies as Offshore Wind Energy, demand new advanced solutions for reducing Operation & Maintenance (O&M) costs, as well as for performing the reliability and extended life-time of wind turbines (WT) and farms (WF).
In this sense, ROMEO is a 5 years project whose main objective is to develop and demonstrate an O&M information management and analytics platform capable of improving the decision making processes of offshore WF operators allowing the transition from calendar base maintenance to condition-based maintenance strategies reducing significantly O&M costs. Thus, a flexible and interoperable IoT platform will provide an advanced analytics ecosystem to better understand the real time behaviour of the main components of the WTs under operation conditions; maximizing their life-time and reducing the need for maintenance, thus minimizing the OPEX which drastically impact on LCoE of offshore Wind Energy.
The project has been structured in three phases:
1st phase “specifications” will pave the way for other phases, defining the specifications and requirements in order to develop a health monitoring strategy for the most relevant and critical components to be further considered.
-nd phase “models/tools/database” will be devoted to the development of health monitoring systems, diagnosis and prognosis tools for failure detection both at WTG components and support structures level, feeding the development of a data acquisition and advanced analytics ecosystem.
3rd phase “O&M/rollout” will develop and deploy an O&M platform to be validated in three pilot scenarios, data that will serve as input for impact assessment with a special focus on LCoE and replicability.
ROMEO consortium is formed by a well-balanced set of experts (12 entities from 7 countries) representing the whole offshore value chain (from WT components manufacturers and service providers through to WF operators) together with IT market leaders, thus ensuring that results will reach the market.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/745625
Start date: 01-06-2017
End date: 31-05-2022
Total budget - Public funding: 16 376 051,00 Euro - 9 999 812,00 Euro
Cordis data

Original description

Emerging technologies as Offshore Wind Energy, demand new advanced solutions for reducing Operation & Maintenance (O&M) costs, as well as for performing the reliability and extended life-time of wind turbines (WT) and farms (WF).
In this sense, ROMEO is a 5 years project whose main objective is to develop and demonstrate an O&M information management and analytics platform capable of improving the decision making processes of offshore WF operators allowing the transition from calendar base maintenance to condition-based maintenance strategies reducing significantly O&M costs. Thus, a flexible and interoperable IoT platform will provide an advanced analytics ecosystem to better understand the real time behaviour of the main components of the WTs under operation conditions; maximizing their life-time and reducing the need for maintenance, thus minimizing the OPEX which drastically impact on LCoE of offshore Wind Energy.
The project has been structured in three phases:
1st phase “specifications” will pave the way for other phases, defining the specifications and requirements in order to develop a health monitoring strategy for the most relevant and critical components to be further considered.
-nd phase “models/tools/database” will be devoted to the development of health monitoring systems, diagnosis and prognosis tools for failure detection both at WTG components and support structures level, feeding the development of a data acquisition and advanced analytics ecosystem.
3rd phase “O&M/rollout” will develop and deploy an O&M platform to be validated in three pilot scenarios, data that will serve as input for impact assessment with a special focus on LCoE and replicability.
ROMEO consortium is formed by a well-balanced set of experts (12 entities from 7 countries) representing the whole offshore value chain (from WT components manufacturers and service providers through to WF operators) together with IT market leaders, thus ensuring that results will reach the market.

Status

CLOSED

Call topic

LCE-13-2016

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.3. SOCIETAL CHALLENGES - Secure, clean and efficient energy
H2020-EU.3.3.2. Low-cost, low-carbon energy supply
H2020-EU.3.3.2.0. Cross-cutting call topics
H2020-LCE-2016-RES-IA
LCE-13-2016 Solutions for reduced maintenance, increased reliability and extended life-time of off-shore wind turbines/farms