GOPV | Global Optimization of integrated PhotoVoltaics system for low electricity cost

Summary
Scenarios have forecasted a long lasting amplification with PV electricity becoming the cheapest electricity source in many regions with costs in the range of 4 to 6 c€/kWh for EU by 2024, while 2.2 c€/kWh has been achieved for a 800 MW PV plant planned in Abu Dhabi for 2019.
The PV market will continue to expand in the coming years with more than a doubling in the production capacity expected for 2024. At the same time investment in production capacities is foreseen to keep growing hence maintaining the sector highly competitive.
For the European PV industry, which is struggling to survive after years of massive investments in China and south-east Asia, the growth of the market represents a chance to come back as a prime player on high-efficiency premium technologies. This is the positioning of GOPV to develop highly competitive technologies for the PV utility market and strong synergies between European players. The project will accelerate reduction of electricity cost implementing advanced PV features and creating synergies across 5 topic areas: Light Management; Energy Efficiency; Material Efficiency; System Reliability; and System configuration and O&M. Ultimately, it will set up an integrated 250 kW PV system to demonstrate a competitive electricity cost of 0.02 €/kWh for irradiation levels of 1900 kWh/m²/year GHI in Southern Europe. The levelised cost of electricity (LCOE) will hence be reduced by 50% (currently 0,04 €/kWh) and the energy payback time reduced by 40%, both in respect to actual standard solution and to PERC best in class mono-facial solution. GOPV project will deliver a 35 years lifetime for the PV string instead of 25 years standards.
Beyond GOPV, the global turnover for the six industrial partners exploiting the results of the project will be close to 48 M€ (2022) and will reach 680 M€ in 2027 (x 14 compare to 2020) with an expectation of creating more than 2000 jobs on the 2022-27 period.
Results, demos, etc. Show all and search (9)
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/792059
Start date: 01-04-2018
End date: 31-03-2023
Total budget - Public funding: 11 234 590,00 Euro - 9 403 873,00 Euro
Cordis data

Original description

Scenarios have forecasted a long lasting amplification with PV electricity becoming the cheapest electricity source in many regions with costs in the range of 4 to 6 c€/kWh for EU by 2024, while 2.2 c€/kWh has been achieved for a 800 MW PV plant planned in Abu Dhabi for 2019.
The PV market will continue to expand in the coming years with more than a doubling in the production capacity expected for 2024. At the same time investment in production capacities is foreseen to keep growing hence maintaining the sector highly competitive.
For the European PV industry, which is struggling to survive after years of massive investments in China and south-east Asia, the growth of the market represents a chance to come back as a prime player on high-efficiency premium technologies. This is the positioning of GOPV to develop highly competitive technologies for the PV utility market and strong synergies between European players. The project will accelerate reduction of electricity cost implementing advanced PV features and creating synergies across 5 topic areas: Light Management; Energy Efficiency; Material Efficiency; System Reliability; and System configuration and O&M. Ultimately, it will set up an integrated 250 kW PV system to demonstrate a competitive electricity cost of 0.02 €/kWh for irradiation levels of 1900 kWh/m²/year GHI in Southern Europe. The levelised cost of electricity (LCOE) will hence be reduced by 50% (currently 0,04 €/kWh) and the energy payback time reduced by 40%, both in respect to actual standard solution and to PERC best in class mono-facial solution. GOPV project will deliver a 35 years lifetime for the PV string instead of 25 years standards.
Beyond GOPV, the global turnover for the six industrial partners exploiting the results of the project will be close to 48 M€ (2022) and will reach 680 M€ in 2027 (x 14 compare to 2020) with an expectation of creating more than 2000 jobs on the 2022-27 period.

Status

SIGNED

Call topic

LCE-10-2017

Update Date

26-10-2022
Images
No images available.
Geographical location(s)