Summary
Formed of three discrete workstreams, the FINE-2 project will investigate means of enabling Integrated Mobility Management (I2M), saving Energy, and reducing inconvenient and disruptive Noise and Vibration (N&V) within the Rail Sector.
As a Cross Cutting Activity of the Shift2Rail Programme, FINE-2 will work alongside multiple existing projects to achieve more impactful results through collaboration and shared learning.
The I2M workstream will help to enhance the business case for intermodal freight transportation by tackling many of the issues present today, such as accurate ETA, control of hazardous material, and reduced resource waste. I2M will also look at improving Rail Operations through the new forms of data combination and representation.
The Energy workstream will develop tools to help understand the energy saving potential, thus Whole Life Cost benefits, of specific enhancements within the industry. It will also optimise tunnel resistance characteristic methodologies, and seek to enhance energy norms to reflect existing state of the art and future developments.
Finally the N&V will develop and enhance existing models and simulation tools from across the S2R programme to better understand the source of external noise, whether the train is at standstill or in motion, to help pinpoint the means of reducing it.
As a Cross Cutting Activity of the Shift2Rail Programme, FINE-2 will work alongside multiple existing projects to achieve more impactful results through collaboration and shared learning.
The I2M workstream will help to enhance the business case for intermodal freight transportation by tackling many of the issues present today, such as accurate ETA, control of hazardous material, and reduced resource waste. I2M will also look at improving Rail Operations through the new forms of data combination and representation.
The Energy workstream will develop tools to help understand the energy saving potential, thus Whole Life Cost benefits, of specific enhancements within the industry. It will also optimise tunnel resistance characteristic methodologies, and seek to enhance energy norms to reflect existing state of the art and future developments.
Finally the N&V will develop and enhance existing models and simulation tools from across the S2R programme to better understand the source of external noise, whether the train is at standstill or in motion, to help pinpoint the means of reducing it.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/881791 |
Start date: | 01-12-2019 |
End date: | 30-09-2023 |
Total budget - Public funding: | - 3 635 174,00 Euro |
Cordis data
Original description
Formed of three discrete workstreams, the FINE-2 project will investigate means of enabling Integrated Mobility Management (I2M), saving Energy, and reducing inconvenient and disruptive Noise and Vibration (N&V) within the Rail Sector.As a Cross Cutting Activity of the Shift2Rail Programme, FINE-2 will work alongside multiple existing projects to achieve more impactful results through collaboration and shared learning.
The I2M workstream will help to enhance the business case for intermodal freight transportation by tackling many of the issues present today, such as accurate ETA, control of hazardous material, and reduced resource waste. I2M will also look at improving Rail Operations through the new forms of data combination and representation.
The Energy workstream will develop tools to help understand the energy saving potential, thus Whole Life Cost benefits, of specific enhancements within the industry. It will also optimise tunnel resistance characteristic methodologies, and seek to enhance energy norms to reflect existing state of the art and future developments.
Finally the N&V will develop and enhance existing models and simulation tools from across the S2R programme to better understand the source of external noise, whether the train is at standstill or in motion, to help pinpoint the means of reducing it.
Status
SIGNEDCall topic
S2R-CFM-CCA-01-2019Update Date
26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all