Inland Waterborne Transport (IWT) advantages as low-energy and low CO2 emitting transport mode are not fully exploited today due to gaps in the logistics system. Inland container vessels pay 6-8 calls at seaport terminals with long waiting times. More time is lost by sub-optimal navigation on rivers and waiting at bridges and locks. In addition, low load factors of containers and vessels impact the logistics systems with unnecessary high numbers of containers being transported and trips being made. NOVIMOVE strategy is to “condense” the logistics system by improving container load factors and by reducing waiting times in seaports, by improved river voyage planning and execution, and by facilitating smooth passages through bridges and locks. NOVIMOVE’s innovations are: (1) cargo reconstruction to raise container load factors, (2) mobile terminals feeding inland barges, (3) smart river navigation by merging satellite (Galileo) and real time river water depths data, (4) smooth passage through bridges/locks by dynamic scheduling system for better corridor management along the TEN-T Rhine-Alpine (R-A) route, (5) concepts for innovative vessels that can adapt to low water condition while maintaining a full payload, and (6) close cooperation with logistic stakeholders, ports and water authorities along the R-A route: Antwerp, Rotterdam, Duisburg, Basel. NOVIMOVE technology developments will be demonstrated by virtual simulation, scaled model tests and full-scale demonstrations. NOVIMOVE innovations will impact the quantity of freight moved by IWT along the R-A corridor by 30% with respect to 2010 baseline data. The NOVIMOVE 21-members consortium combines logistics operators, ports, system-developers and research organisations from 4 EU member states and two associate countries. The work plan contains 4 technical Work Packages. The project duration is four years; the requested funding is 8,9 MIO.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/858508 |
Start date: | 01-06-2020 |
End date: | 31-05-2024 |
Total budget - Public funding: | 8 916 378,00 Euro - 8 916 378,00 Euro |
Cordis data
Original description
Inland Waterborne Transport (IWT) advantages as low-energy and low CO2 emitting transport mode are not fully exploited today due to gaps in the logistics system. Inland container vessels pay 6-8 calls at seaport terminals with long waiting times. More time is lost by sub-optimal navigation on rivers and waiting at bridges and locks. In addition, low load factors of containers and vessels impact the logistics systems with unnecessary high numbers of containers being transported and trips being made. NOVIMOVE strategy is to “condense” the logistics system by improving container load factors and by reducing waiting times in seaports, by improved river voyage planning and execution, and by facilitating smooth passages through bridges and locks. NOVIMOVE’s innovations are: (1) cargo reconstruction to raise container load factors, (2) mobile terminals feeding inland barges, (3) smart river navigation by merging satellite (Galileo) and real time river water depths data, (4) smooth passage through bridges/locks by dynamic scheduling system for better corridor management along the TEN-T Rhine-Alpine (R-A) route, (5) concepts for innovative vessels that can adapt to low water condition while maintaining a full payload, and (6) close cooperation with logistic stakeholders, ports and water authorities along the R-A route: Antwerp, Rotterdam, Duisburg, Basel. NOVIMOVE technology developments will be demonstrated by virtual simulation, scaled model tests and full-scale demonstrations. NOVIMOVE innovations will impact the quantity of freight moved by IWT along the R-A corridor by 30% with respect to 2010 baseline data. The NOVIMOVE 21-members consortium combines logistics operators, ports, system-developers and research organisations from 4 EU member states and two associate countries. The work plan contains 4 technical Work Packages. The project duration is four years; the requested funding is 8,9 MIO.Status
SIGNEDCall topic
MG-2-6-2019Update Date
26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all