Summary
The main objective of the WELDER project is to design, develop and deploy two robot-based, modular, flexible (Plug-and-Produce) and fully operative welding solutions (namely, ultrasonic welding and resistance welding end-effectors), including all the needed tooling and auxiliaries for performing the longitudinal barrel joint of the 8 m long fuselage at the Multi-Functional Fuselage Demonstrator. Moreover, WELDER will be focused on implementing an online monitoring and control system based on an end-to-end digital manufacturing solution, which will stablish a bidirectional dataflow to feed the whole lifecycle management digital twin and, thus, optimising the process and product performance while enabling new approval/acceptance procedures. Therefore, the successful execution of the WELDER project will become the spearhead of the aerospace industry thermoplastic adoption strategy through the provision and demonstration of the airplane fuselage welding replacing conventional joining systems that currently relies on fastening, riveting and adhesives, thus highly improving the environmental and economic performance of the aerospace sector, according to CS2 objectives.
The following results will also be achieved at the end of the project:
- A methodology for integrating new welding equipment (ultrasonic and resistance) on existing end-users´ facilities, regarding equipment set-up, tooling and auxiliary's integration.
- Frame coupling designs validation and an optimised manufacturing process based on the resistance metal mesh embedding within the coupling product.
- Inline monitoring and control digital pipeline in view to directly feeding into the demonstrators Product Lifecycle Management Digital Twin within 3D experience.
- Equipment and process optimisation based on real-process data gathering and feeding into the simulation and design tools.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/101007814
Start date: 01-01-2021
End date: 31-12-2023
Total budget - Public funding: 1 592 062,00 Euro - 1 399 575,00 Euro
Cordis data

Original description

The main objective of the WELDER project is to design, develop and deploy two robot-based, modular, flexible (Plug-and-Produce) and fully operative welding solutions (namely, ultrasonic welding and resistance welding end-effectors), including all the needed tooling and auxiliaries for performing the longitudinal barrel joint of the 8 m long fuselage at the Multi-Functional Fuselage Demonstrator. Moreover, WELDER will be focused on implementing an online monitoring and control system based on an end-to-end digital manufacturing solution, which will stablish a bidirectional dataflow to feed the whole lifecycle management digital twin and, thus, optimising the process and product performance while enabling new approval/acceptance procedures. Therefore, the successful execution of the WELDER project will become the spearhead of the aerospace industry thermoplastic adoption strategy through the provision and demonstration of the airplane fuselage welding replacing conventional joining systems that currently relies on fastening, riveting and adhesives, thus highly improving the environmental and economic performance of the aerospace sector, according to CS2 objectives.
The following results will also be achieved at the end of the project:
- A methodology for integrating new welding equipment (ultrasonic and resistance) on existing end-users´ facilities, regarding equipment set-up, tooling and auxiliary's integration.
- Frame coupling designs validation and an optimised manufacturing process based on the resistance metal mesh embedding within the coupling product.
- Inline monitoring and control digital pipeline in view to directly feeding into the demonstrators Product Lifecycle Management Digital Twin within 3D experience.
- Equipment and process optimisation based on real-process data gathering and feeding into the simulation and design tools.

Status

SIGNED

Call topic

JTI-CS2-2020-CfP11-LPA-02-34

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.0. Cross-cutting call topics
H2020-CS2-CFP11-2020-01
JTI-CS2-2020-CfP11-LPA-02-34 Tooling, Equipment and Auxiliaries for the closure of a longitudinal Barrel Joint: Overlap joint and Frame Coupling integration