IDEN | Innovative Distributed Electrical Network

Summary
With the introduction of the more electric aircraft greater emphasis is placed on the power generation and distribution architecture as a result of increased power demands and higher efficiency needs, as well as the interest in using electrical power for more flight critical applications.
Together with the steady drive for reduced weight, increased reliability and reduced maintenance, this leads to the requirement for new approaches for the aircraft electrical supply generation and distribution, managed intelligently to maximise efficiency and ensure safe aircraft operation under all conditions.
The prime aim of the project is the design, development and test of an ‘Innovative Primary & Secondary Electrical Distribution Network for Regional A/C’ based upon state of the art power semiconductors and enhanced electrical energy management (E2-EM).
The EPGDS to be designed comprising 2 Primary Power Centres - PPC, 4 Secondary Distribution Units - SDU, 2 AC/DC converters, solid-state based contactor/breakers - SSPC and externally provided System Supervisor & DC/DC converter interface between HV & LV primary bus bars.
The system will be designed to interface to the REG Iron Bird facilities.
The design of each LRU will be based upon the use of state of the art power semiconductor devices, innovative circuit topologies and embedded intelligence.
A foundation stone of the EPGDS system is the effective modelling of each of the LRU’s and the overall system to enable the investigation of diverse operating conditions, permit verification of correct functionality and highlight any deficiencies at an early stage. In addition it will permit the use of automatic code generation of each LRU embedded controller.
All designs will take into account the specification requirements for avionic equipment in order to facilitate future development to production & certification. Thermal, vibration and EMC survey of key elements will be performed.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/821328
Start date: 01-10-2018
End date: 30-11-2021
Total budget - Public funding: 1 399 037,00 Euro - 1 399 037,00 Euro
Cordis data

Original description

With the introduction of the more electric aircraft greater emphasis is placed on the power generation and distribution architecture as a result of increased power demands and higher efficiency needs, as well as the interest in using electrical power for more flight critical applications.
Together with the steady drive for reduced weight, increased reliability and reduced maintenance, this leads to the requirement for new approaches for the aircraft electrical supply generation and distribution, managed intelligently to maximise efficiency and ensure safe aircraft operation under all conditions.
The prime aim of the project is the design, development and test of an ‘Innovative Primary & Secondary Electrical Distribution Network for Regional A/C’ based upon state of the art power semiconductors and enhanced electrical energy management (E2-EM).
The EPGDS to be designed comprising 2 Primary Power Centres - PPC, 4 Secondary Distribution Units - SDU, 2 AC/DC converters, solid-state based contactor/breakers - SSPC and externally provided System Supervisor & DC/DC converter interface between HV & LV primary bus bars.
The system will be designed to interface to the REG Iron Bird facilities.
The design of each LRU will be based upon the use of state of the art power semiconductor devices, innovative circuit topologies and embedded intelligence.
A foundation stone of the EPGDS system is the effective modelling of each of the LRU’s and the overall system to enable the investigation of diverse operating conditions, permit verification of correct functionality and highlight any deficiencies at an early stage. In addition it will permit the use of automatic code generation of each LRU embedded controller.
All designs will take into account the specification requirements for avionic equipment in order to facilitate future development to production & certification. Thermal, vibration and EMC survey of key elements will be performed.

Status

CLOSED

Call topic

JTI-CS2-2017-CfP07-REG-01-15

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.5. CLEANSKY2
H2020-EU.3.4.5.2. IADP Regional Aircraft
H2020-CS2-CFP07-2017-02
JTI-CS2-2017-CfP07-REG-01-15 Innovative Primary and Secondary Electrical Distribution Network for Regional A/C