SMART2 | Advanced integrated obstacle and track intrusion detection system for smart automation of rail transport

Summary
SMART2 project will build on the results achieved in project SMART by advancement, innovation and implementation of SMART2 on-board long-range all-weather obstacle detection (OD) and track intrusion detection (TID) system. 2 new systems will be also researched, innovate and developed: advanced SMART2 trackside (TS) /airborne OD&TID systems. All 3 systems will be integrated into a holistic OD&TDI system via interfaces to central Decision Support System (DSS). A holistic approach to autonomous obstacle detection for railways would enable increased detection area including areas behind a curve, slope, tunnels and other elements blocking the train’s view on the rail tracks, in addition to a long-range straight rail-tracks OD. SMART2 platform will be flexible and open for interfacing additional OD&TDI modules based on future technologies.
SMART2 project aims at developing a working prototype of the foreseen holistic OD&TDI that will be evaluated in different real-world railway use-case scenarios (TRL 6/7).
The SMART2 will review and assess the relevant requirements, including existing ones (in regulation or related to current technologies), as well as those relating to emerging technologies (as being defined in past and ongoing R&D projects). Based on this analysis, a new set of lower complexity requirements will be proposed for a harmonised approach concerning all systems involved in the implementation of ATO GoA 3/4, in general, and, particularly for the OD&TID System.
Results, demos, etc. Show all and search (38)
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/881784
Start date: 01-12-2019
End date: 30-11-2022
Total budget - Public funding: 1 708 737,00 Euro - 1 499 528,00 Euro
Cordis data

Original description

SMART2 project will build on the results achieved in project SMART by advancement, innovation and implementation of SMART2 on-board long-range all-weather obstacle detection (OD) and track intrusion detection (TID) system. 2 new systems will be also researched, innovate and developed: advanced SMART2 trackside (TS) /airborne OD&TID systems. All 3 systems will be integrated into a holistic OD&TDI system via interfaces to central Decision Support System (DSS). A holistic approach to autonomous obstacle detection for railways would enable increased detection area including areas behind a curve, slope, tunnels and other elements blocking the train’s view on the rail tracks, in addition to a long-range straight rail-tracks OD. SMART2 platform will be flexible and open for interfacing additional OD&TDI modules based on future technologies.
SMART2 project aims at developing a working prototype of the foreseen holistic OD&TDI that will be evaluated in different real-world railway use-case scenarios (TRL 6/7).
The SMART2 will review and assess the relevant requirements, including existing ones (in regulation or related to current technologies), as well as those relating to emerging technologies (as being defined in past and ongoing R&D projects). Based on this analysis, a new set of lower complexity requirements will be proposed for a harmonised approach concerning all systems involved in the implementation of ATO GoA 3/4, in general, and, particularly for the OD&TID System.

Status

CLOSED

Call topic

S2R-OC-IP5-02-2019

Update Date

26-10-2022