X2Rail-3 | Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication

Summary
X2RAIL-3 represents the 3rd proposal of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs):
Adaptable Communications for all Railways (TD2.1 / WP3) – The objective is to demonstrate, via the integration of the different prototypes into dedicated demonstrators, that a new Communication System will be able to overcome the shortcomings in current ETCS and CBTC communications and deliver an adaptable communications system usable for train control applications in all market segments.
Moving Block (TD 2.3 / WP4) – the scope is to move beyond the laboratory preparations undertaken in the framework of the X2Rail-1 project and to develop technical demonstrators for suitable railways applications.
Zero On-Site Testing (TD 2.6 / WP5) – In the context of the simulation and testing framework integrating new functionalities such as moving block/satellite positioning, finalising the general architecture and will as well perform specific prototypes.
Virtually Coupled Train Sets (TD 2.8 / WP6 & WP7) – The action aims to perform a comprehensive study focusing on the new concept of “Virtual coupling”, which foresees that trains will be able to run much closer to one another and to dynamically modify their own composition on the move.
Cyber Security (TD 2.11 / WP8 & WP9) – In the context of Cyber Security, the main objectives are to define a “Cyber-Security” System to railway and to contribute to a secure development standard applicable to railway applications.
ATO over ETCS pilot test for freight demonstrator (TD 5.6 / WP10) – In the context of freight autonomous train operation, the main objective is to perform field testing with specific focus on freight operational scenarios to get early feedback from the field on potential improvement necessities.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/826141
Start date: 01-12-2018
End date: 30-11-2021
Total budget - Public funding: - 17 166 487,00 Euro
Cordis data

Original description

X2RAIL-3 represents the 3rd proposal of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs):
Adaptable Communications for all Railways (TD2.1 / WP3) – The objective is to demonstrate, via the integration of the different prototypes into dedicated demonstrators, that a new Communication System will be able to overcome the shortcomings in current ETCS and CBTC communications and deliver an adaptable communications system usable for train control applications in all market segments.
Moving Block (TD 2.3 / WP4) – the scope is to move beyond the laboratory preparations undertaken in the framework of the X2Rail-1 project and to develop technical demonstrators for suitable railways applications.
Zero On-Site Testing (TD 2.6 / WP5) – In the context of the simulation and testing framework integrating new functionalities such as moving block/satellite positioning, finalising the general architecture and will as well perform specific prototypes.
Virtually Coupled Train Sets (TD 2.8 / WP6 & WP7) – The action aims to perform a comprehensive study focusing on the new concept of “Virtual coupling”, which foresees that trains will be able to run much closer to one another and to dynamically modify their own composition on the move.
Cyber Security (TD 2.11 / WP8 & WP9) – In the context of Cyber Security, the main objectives are to define a “Cyber-Security” System to railway and to contribute to a secure development standard applicable to railway applications.
ATO over ETCS pilot test for freight demonstrator (TD 5.6 / WP10) – In the context of freight autonomous train operation, the main objective is to perform field testing with specific focus on freight operational scenarios to get early feedback from the field on potential improvement necessities.

Status

CLOSED

Call topic

S2R-CFM-IP2-01-2018

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.8. Shift2Rail JU
H2020-EU.3.4.8.2. Innovation Programme 2: Advanced traffic management and control systems
H2020-S2RJU-CFM-2018
S2R-CFM-IP2-01-2018 Advanced Signalling, Automation and Communication System (IP2 and IP5)