DYNAFREIGHT | Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains

Summary
DYNAFREIGHT stands for Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains. The project will provide inputs for the development of the next railway freight propulsion concepts within S2R. Two main areas will be addressed:
1. Freight running gear for locomotives: DYNAFREIGHT will design and develop the necessary concepts that will allow a locomotive freight bogie to reduce wheel and track wear, to have lower noise and lower LCC, by focusing on:
• Materials with freight vehicle applicability that allow a lighter bogie frame.
• Noise optimized wheelsets and absorbing structures to reduce running gear related noise.
• Passive and mechatronic systems for radial steering, improving running performances compared to conventional bogies. Reduction of wheel wear and damage, improved traction in curves and reduced resistance to motion in sharp curves will be achieved.
• Monitoring of the most maintenance cost-intensive bogie elements, reducing LCC and improving the reliability and availability of the locomotive.
2. Operation of long freight trains: following the outcomes of MARATHON, DYNAFREIGHT will prepare the path for regular operations of long freight trains:
• Defining functional, technical and homologation requirements for a radio remote controlled system.
• Proposing safety precautions in train configuration and brake application by simulating the longitudinal forces and the derailment risk of long freight trains.
• Identifying infrastructure adaptions for the operation of long freight trains.
By the end of the project, the main achievements will be:
• Improved performances: traction, speed, running dynamics and wheel/rail efforts
• Reduced rail freight noise at the source
• Enhance capacity/traffic throughput with the operation of longer trains
• Reduced of operation and maintenance costs (reduce wheel and rail wear, smarter maintenance, etc.)
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/730811
Start date: 01-11-2016
End date: 30-06-2018
Total budget - Public funding: 999 822,50 Euro - 999 822,00 Euro
Cordis data

Original description

DYNAFREIGHT stands for Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains. The project will provide inputs for the development of the next railway freight propulsion concepts within S2R. Two main areas will be addressed:
1. Freight running gear for locomotives: DYNAFREIGHT will design and develop the necessary concepts that will allow a locomotive freight bogie to reduce wheel and track wear, to have lower noise and lower LCC, by focusing on:
• Materials with freight vehicle applicability that allow a lighter bogie frame.
• Noise optimized wheelsets and absorbing structures to reduce running gear related noise.
• Passive and mechatronic systems for radial steering, improving running performances compared to conventional bogies. Reduction of wheel wear and damage, improved traction in curves and reduced resistance to motion in sharp curves will be achieved.
• Monitoring of the most maintenance cost-intensive bogie elements, reducing LCC and improving the reliability and availability of the locomotive.
2. Operation of long freight trains: following the outcomes of MARATHON, DYNAFREIGHT will prepare the path for regular operations of long freight trains:
• Defining functional, technical and homologation requirements for a radio remote controlled system.
• Proposing safety precautions in train configuration and brake application by simulating the longitudinal forces and the derailment risk of long freight trains.
• Identifying infrastructure adaptions for the operation of long freight trains.
By the end of the project, the main achievements will be:
• Improved performances: traction, speed, running dynamics and wheel/rail efforts
• Reduced rail freight noise at the source
• Enhance capacity/traffic throughput with the operation of longer trains
• Reduced of operation and maintenance costs (reduce wheel and rail wear, smarter maintenance, etc.)

Status

CLOSED

Call topic

S2R-OC-IP5-02-2015

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.8. Shift2Rail JU
H2020-EU.3.4.8.5. Innovation Programme 5: Technologies for sustainable and attractive European rail freight
H2020-S2RJU-OC-2015-01-2
S2R-OC-IP5-02-2015 Improved vehicle/train dynamics