Summary
This document adress the LEACH International Europe proposal to the HVDC electrical master box (HVEMB) for the Cleansky 2 helicopter demonstrator in the scope of CS2-2014-CFP01-FRC-02-08 call.
LIE’s objective through this project is to develop the next generation of Power Distribution Unit based on a new generation of high voltage commutation devices, themselves based on electromechanical and electronic switching components.
LIE’s objective through this project is to develop the next generation of Power Distribution Unit based on a new generation of high voltage commutation devices, themselves based on electromechanical and electronic switching components.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/686085 |
Start date: | 01-04-2016 |
End date: | 31-07-2020 |
Total budget - Public funding: | 1 476 620,00 Euro - 690 000,00 Euro |
Cordis data
Original description
This document adress the LEACH International Europe proposal to the HVDC electrical master box (HVEMB) for the Cleansky 2 helicopter demonstrator in the scope of CS2-2014-CFP01-FRC-02-08 call.LIE’s objective through this project is to develop the next generation of Power Distribution Unit based on a new generation of high voltage commutation devices, themselves based on electromechanical and electronic switching components.
Status
CLOSEDCall topic
JTI-CS2-2014-CFP01-FRC-02-08Update Date
27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all