Summary
PJ19 W2 CI is a transversal activity of the SESAR 2020 Programme in continuation of the SESAR Wave 1 PJ19 CI Content Integration project.
It aims to integrate the SESAR Solutions into the integrated European ATM System in order to achieve the objectives set by the ATM Master Plan (MP). This integrated European ATM System provides the overall European ATM concept, the high-level architecture options, the services, the supporting solutions, and the performance achievements associated with them. As such, PJ.19 W2 does not create any specific ATM concept or solution but produces a set of deliverables which consolidate the SESAR 2020 Programme outcomes and provides yearly integrated reference material – the SESAR 2020 Architecture release (EATMA version) . This is done in close collaboration and coordination with all SESAR 2020 Solutions and the SJU through continuous, rolling and iterative content integration.
PJ19-W2 allows the assessment of the overall performance of the SESAR Solutions compared with the performance improvements expected for the European ATM.
Whilst the decisions are made by SJU management and SESAR governance, PJ.19 W2 activities support and guide the processes (e.g. safety, security assessment, human performance, performance assessment, cost benefit analysis (CBA), architecture, requirements) to bring the SESAR Solutions together and assess their maturity (completeness, consistency and coherency) from a holistic perspective represented in the SESAR 2020 Concept of Operations.
The PJ.19 W2 activities provide major inputs for the ATM MP production (ATM architecture information (e.g. data set), performance and CBA consolidation, business case production), which are further consolidated at the time of the ATM MP update campaign by the PJ.20 W2 ‘Master Planning’ project).
PJ19-W2 provides support for the SJU/SESAR governance decision-making and programme execution monitoring and also contributes to the realisation of the ATM MP.
It aims to integrate the SESAR Solutions into the integrated European ATM System in order to achieve the objectives set by the ATM Master Plan (MP). This integrated European ATM System provides the overall European ATM concept, the high-level architecture options, the services, the supporting solutions, and the performance achievements associated with them. As such, PJ.19 W2 does not create any specific ATM concept or solution but produces a set of deliverables which consolidate the SESAR 2020 Programme outcomes and provides yearly integrated reference material – the SESAR 2020 Architecture release (EATMA version) . This is done in close collaboration and coordination with all SESAR 2020 Solutions and the SJU through continuous, rolling and iterative content integration.
PJ19-W2 allows the assessment of the overall performance of the SESAR Solutions compared with the performance improvements expected for the European ATM.
Whilst the decisions are made by SJU management and SESAR governance, PJ.19 W2 activities support and guide the processes (e.g. safety, security assessment, human performance, performance assessment, cost benefit analysis (CBA), architecture, requirements) to bring the SESAR Solutions together and assess their maturity (completeness, consistency and coherency) from a holistic perspective represented in the SESAR 2020 Concept of Operations.
The PJ.19 W2 activities provide major inputs for the ATM MP production (ATM architecture information (e.g. data set), performance and CBA consolidation, business case production), which are further consolidated at the time of the ATM MP update campaign by the PJ.20 W2 ‘Master Planning’ project).
PJ19-W2 provides support for the SJU/SESAR governance decision-making and programme execution monitoring and also contributes to the realisation of the ATM MP.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/874473 |
Start date: | 01-12-2019 |
End date: | 30-06-2023 |
Total budget - Public funding: | 25 731 396,00 Euro - 4 473 968,00 Euro |
Cordis data
Original description
PJ19 W2 CI is a transversal activity of the SESAR 2020 Programme in continuation of the SESAR Wave 1 PJ19 CI Content Integration project.It aims to integrate the SESAR Solutions into the integrated European ATM System in order to achieve the objectives set by the ATM Master Plan (MP). This integrated European ATM System provides the overall European ATM concept, the high-level architecture options, the services, the supporting solutions, and the performance achievements associated with them. As such, PJ.19 W2 does not create any specific ATM concept or solution but produces a set of deliverables which consolidate the SESAR 2020 Programme outcomes and provides yearly integrated reference material – the SESAR 2020 Architecture release (EATMA version) . This is done in close collaboration and coordination with all SESAR 2020 Solutions and the SJU through continuous, rolling and iterative content integration.
PJ19-W2 allows the assessment of the overall performance of the SESAR Solutions compared with the performance improvements expected for the European ATM.
Whilst the decisions are made by SJU management and SESAR governance, PJ.19 W2 activities support and guide the processes (e.g. safety, security assessment, human performance, performance assessment, cost benefit analysis (CBA), architecture, requirements) to bring the SESAR Solutions together and assess their maturity (completeness, consistency and coherency) from a holistic perspective represented in the SESAR 2020 Concept of Operations.
The PJ.19 W2 activities provide major inputs for the ATM MP production (ATM architecture information (e.g. data set), performance and CBA consolidation, business case production), which are further consolidated at the time of the ATM MP update campaign by the PJ.20 W2 ‘Master Planning’ project).
PJ19-W2 provides support for the SJU/SESAR governance decision-making and programme execution monitoring and also contributes to the realisation of the ATM MP.
Status
SIGNEDCall topic
SESAR-IR-VLD-WAVE2-01-2019Update Date
27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all