X2RAIL-2 | Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions

Summary
X2RAIL-2 represents the 2nd proposal of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain.
The pillar (IP2) challenge is to increase functionalities of the existing signalling and automation systems and related design and validation processes providing a more competitive, flexible, real-time, intelligent traffic management and decision support system, and maintaining backward compatibility to the existing European Rail Traffic Management System (ERTMS) and especially its European Train Control System component (ETCS).
The X2RAIL-2 project aims, according to the MAAP, to research and develop four selected key technologies to foster innovations in the field of railway signaling and automation systems within the following Technology Demonstrators (TDs):
Fail-Safe Train Positioning (TD2.4) - To achieve a significant reduction of the use of traditional train detection systems by means of the attainment of an absolute and safe train positioning system based on a multi-sensor concept, where GNSS is the preferred technology.
On-Board Train Integrity (TD2.5) - To achieve the safe On-board Train Integrity to allow the application of new signaling train separation concepts (e.g. Moving Block or Virtual Block) based on the train self -localization rather than on traditional train detection systems.
Formal Methods (TD2.7) - To innovate and standardise processes and interfaces in the evolution phases of a signaling project (e.g.: design, implementation, test & commissioning, operation & maintenance) to rationalize the approach and to reduce time-to-market costs.
Traffic Management Evolution (TD2.9) - To improve standardisation and integration of Traffic Management processes with the aim to achieve flexibility and scalability within the choice of functional service module managed by TMS.
The X2RAIL-2 project aims at reaching TRL5/6 demonstrators.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/777465
Start date: 01-09-2017
End date: 30-04-2021
Total budget - Public funding: 13 399 916,79 Euro - 13 399 916,00 Euro
Cordis data

Original description

X2RAIL-2 represents the 2nd proposal of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain.
The pillar (IP2) challenge is to increase functionalities of the existing signalling and automation systems and related design and validation processes providing a more competitive, flexible, real-time, intelligent traffic management and decision support system, and maintaining backward compatibility to the existing European Rail Traffic Management System (ERTMS) and especially its European Train Control System component (ETCS).
The X2RAIL-2 project aims, according to the MAAP, to research and develop four selected key technologies to foster innovations in the field of railway signaling and automation systems within the following Technology Demonstrators (TDs):
Fail-Safe Train Positioning (TD2.4) - To achieve a significant reduction of the use of traditional train detection systems by means of the attainment of an absolute and safe train positioning system based on a multi-sensor concept, where GNSS is the preferred technology.
On-Board Train Integrity (TD2.5) - To achieve the safe On-board Train Integrity to allow the application of new signaling train separation concepts (e.g. Moving Block or Virtual Block) based on the train self -localization rather than on traditional train detection systems.
Formal Methods (TD2.7) - To innovate and standardise processes and interfaces in the evolution phases of a signaling project (e.g.: design, implementation, test & commissioning, operation & maintenance) to rationalize the approach and to reduce time-to-market costs.
Traffic Management Evolution (TD2.9) - To improve standardisation and integration of Traffic Management processes with the aim to achieve flexibility and scalability within the choice of functional service module managed by TMS.
The X2RAIL-2 project aims at reaching TRL5/6 demonstrators.

Status

SIGNED

Call topic

S2R-CFM-IP2-01-2017

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.8. Shift2Rail JU
H2020-EU.3.4.8.2. Innovation Programme 2: Advanced traffic management and control systems
H2020-S2RJU-CFM-2017
S2R-CFM-IP2-01-2017 Enhancing railway signalling systems thanks to applying satellite positioning; developing an on-board safe Train Integrity; applying formal methods approach and standardised interfaces, and enhancing Traffic Management System (TMS) functions