Summary
INN-PAEK will face the industrial production of the PAEK-based Flange Wheel for the electrical environmental control system by applying the 5Ms injection window process developed, validated and optimised by AITIIP over the last 25 year for transferring complex metallic parts to lightweight polymeric components.
The 5Ms injection window process starts Modelling the bests solution, combining
i) rheological, kinematic and mechanical simulation, ii) validation (coupons and specimens) tests and iii) optimisation algorithms to select the optimal Material formulation and its transformation process as well as the Mould geometry and the required innovations. In INN-PAEK, this process will be also based on the capacity of the additive manufacturing technologies to produce complex moulds that will modify its geometry during the transformation process to get properly adapted to complex geometries. Finally, the 5Ms injection window process includes destructive (mainly mechanical) and non-destructive (tomography) tests to check the right Manufacturing of the polymeric part, allowing to implement the required modifications in the mould and feeding the Machine learning phase, based on optimisation algorithms generated in previous research and innovation projects. The machine learning phase will also consider the information captured from the technician experience, the dedicated in process sensors (rheological sprue) implemented in the injection machine and the LCA and LCC analysis of the final parts.
This process has been already successfully used by AITIIP with complex parts for automotive, urban furniture or medical applications among others. INN-PAEK will demonstrate the production of flange wheel with a cost reduction by 30%, a weight reduction by 40% that implies a CO2 emissions reduction by 30 during the operation phase as well as a 20% reduction during the manufacturing process.
The 5Ms injection window process starts Modelling the bests solution, combining
i) rheological, kinematic and mechanical simulation, ii) validation (coupons and specimens) tests and iii) optimisation algorithms to select the optimal Material formulation and its transformation process as well as the Mould geometry and the required innovations. In INN-PAEK, this process will be also based on the capacity of the additive manufacturing technologies to produce complex moulds that will modify its geometry during the transformation process to get properly adapted to complex geometries. Finally, the 5Ms injection window process includes destructive (mainly mechanical) and non-destructive (tomography) tests to check the right Manufacturing of the polymeric part, allowing to implement the required modifications in the mould and feeding the Machine learning phase, based on optimisation algorithms generated in previous research and innovation projects. The machine learning phase will also consider the information captured from the technician experience, the dedicated in process sensors (rheological sprue) implemented in the injection machine and the LCA and LCC analysis of the final parts.
This process has been already successfully used by AITIIP with complex parts for automotive, urban furniture or medical applications among others. INN-PAEK will demonstrate the production of flange wheel with a cost reduction by 30%, a weight reduction by 40% that implies a CO2 emissions reduction by 30 during the operation phase as well as a 20% reduction during the manufacturing process.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/101007865 |
Start date: | 01-01-2021 |
End date: | 30-06-2023 |
Total budget - Public funding: | 739 125,00 Euro - 739 125,00 Euro |
Cordis data
Original description
INN-PAEK will face the industrial production of the PAEK-based Flange Wheel for the electrical environmental control system by applying the 5Ms injection window process developed, validated and optimised by AITIIP over the last 25 year for transferring complex metallic parts to lightweight polymeric components.The 5Ms injection window process starts Modelling the bests solution, combining
i) rheological, kinematic and mechanical simulation, ii) validation (coupons and specimens) tests and iii) optimisation algorithms to select the optimal Material formulation and its transformation process as well as the Mould geometry and the required innovations. In INN-PAEK, this process will be also based on the capacity of the additive manufacturing technologies to produce complex moulds that will modify its geometry during the transformation process to get properly adapted to complex geometries. Finally, the 5Ms injection window process includes destructive (mainly mechanical) and non-destructive (tomography) tests to check the right Manufacturing of the polymeric part, allowing to implement the required modifications in the mould and feeding the Machine learning phase, based on optimisation algorithms generated in previous research and innovation projects. The machine learning phase will also consider the information captured from the technician experience, the dedicated in process sensors (rheological sprue) implemented in the injection machine and the LCA and LCC analysis of the final parts.
This process has been already successfully used by AITIIP with complex parts for automotive, urban furniture or medical applications among others. INN-PAEK will demonstrate the production of flange wheel with a cost reduction by 30%, a weight reduction by 40% that implies a CO2 emissions reduction by 30 during the operation phase as well as a 20% reduction during the manufacturing process.
Status
CLOSEDCall topic
JTI-CS2-2020-CFP11-SYS-02-62Update Date
27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping