IMPaCT | Integrated Modular Plant and Containerised Tools for Selective, Low-impact Mining of Small High-grade Deposits

Summary
The current mining paradigm promotes extraction from large ‘world-class’ deposits that have required innovations in mining techniques to deal with low grades, large infrastructure to deal with high throughputs and large feasibility studies to prove long-term commercial viability. High investment in operations is no longer available in the current economic climate and many small companies have ceased to trade, concentrating production and limiting the ability of the raw materials market to respond to increased demand for raw materials or shortages in raw material supply. The problem is most extreme for critical raw materials that are produced in small quantities relative to traditional metal commodities because the potential return on investment is too low. The IMPaCT project proposes a solution that develops a new switch on-switch off (SOSO) mining paradigm to improve the viability of many critical metal and other small complex deposits.
The whole systems approach that we have adopted to realise the SOSO mining paradigm centres around technological innovations in mining equipment design and mine planning that would reduce the feasibility studies required, throughput of extracted material, infrastructure, land use, resource consumption and waste. Successful business models for SOSO mining require that mining and processing technologies can be adapted to multiple deposits and commodities. Risks that are associated with the approach concern geological uncertainty, metallurgical variability and social acceptance. The work programme aims to develop the proof-of-concept of total and sustainable mining and processing solutions using case studies in the West Balkans, and subsequently to examine the step-changes that would be required for the technology to be applied globally. The companies involved in the project intend to commercialise the results. Dissemination activities include feedback to European and national policy makers, and the mining industry in general.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/730411
Start date: 01-12-2016
End date: 30-11-2020
Total budget - Public funding: 6 991 820,00 Euro - 6 991 820,00 Euro
Cordis data

Original description

The current mining paradigm promotes extraction from large ‘world-class’ deposits that have required innovations in mining techniques to deal with low grades, large infrastructure to deal with high throughputs and large feasibility studies to prove long-term commercial viability. High investment in operations is no longer available in the current economic climate and many small companies have ceased to trade, concentrating production and limiting the ability of the raw materials market to respond to increased demand for raw materials or shortages in raw material supply. The problem is most extreme for critical raw materials that are produced in small quantities relative to traditional metal commodities because the potential return on investment is too low. The IMPaCT project proposes a solution that develops a new switch on-switch off (SOSO) mining paradigm to improve the viability of many critical metal and other small complex deposits.
The whole systems approach that we have adopted to realise the SOSO mining paradigm centres around technological innovations in mining equipment design and mine planning that would reduce the feasibility studies required, throughput of extracted material, infrastructure, land use, resource consumption and waste. Successful business models for SOSO mining require that mining and processing technologies can be adapted to multiple deposits and commodities. Risks that are associated with the approach concern geological uncertainty, metallurgical variability and social acceptance. The work programme aims to develop the proof-of-concept of total and sustainable mining and processing solutions using case studies in the West Balkans, and subsequently to examine the step-changes that would be required for the technology to be applied globally. The companies involved in the project intend to commercialise the results. Dissemination activities include feedback to European and national policy makers, and the mining industry in general.

Status

CLOSED

Call topic

SC5-13-2016-2017

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.5. SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials
H2020-EU.3.5.3. Ensuring the sustainable supply of non-energy and non-agricultural raw materials
H2020-EU.3.5.3.0. Cross-cutting call topics
H2020-SC5-2016-OneStageB
SC5-13-2016-2017 New solutions for sustainable production of raw materials
H2020-SC5-2017-OneStageB
SC5-13-2016-2017 New solutions for sustainable production of raw materials