Summary
A key EU policy aims to reduce the Union dependency on raw materials imports, in particular (candidate) Critical Raw Materials that are vital for the EU innovative technologies. Topic SC5-11c-2015 scope focuses on “developing new highly-automated technological sustainable solutions for deep mining … in the sea bed combined with in-situ processing of minerals”. An existing but challenging raw material resource concerns polymetallic nodules. These round to elongated concretions of 1–15 cm diameter form on sediment-covered deep-sea plains in all oceans between 4-6000m water depth. The challenge to harvest and transport the nodules to the EU shore is taken on by Blue Nodules. The governing project principle is: industrial viability within the context of a realistic and technical, economic and environmentally balanced business case for the complete Polymetallic Nodules value chain of mining, processing and valorisation. Blue Nodules will develop and test to TRL6 maturity a new highly-automated and technologically sustainable deep sea mining system. Key features are: an annual production capability of 2 Million Tons nodules in water depths up to 6000m, in-situ processing of the nodules and intrinsic safe working conditions. Technical WPs are dedicated to subsea harvesting equipment & control technology, in-situ seafloor processing of polymetallic nodules and sea surface, land operations & processes. A dedicated WP focuses on environmental issues and on an Environmental Impact Assessment (EIA). A WP setting requirements and assessing the developed technology controls the entire work plan structure. High credibility is obtained by linking the project work to a nodule field licence owned by a project partner and located in the most promising known nodule deposit: the Clarion Clipperton Zone. The project consortium contains 14 leading industry and research partners from 9 EU member states. The project duration is 48 months, the required funding amounts to 8 Million.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/688975 |
Start date: | 01-02-2016 |
End date: | 31-07-2020 |
Total budget - Public funding: | 7 991 137,50 Euro - 7 991 137,00 Euro |
Cordis data
Original description
A key EU policy aims to reduce the Union dependency on raw materials imports, in particular (candidate) Critical Raw Materials that are vital for the EU innovative technologies. Topic SC5-11c-2015 scope focuses on “developing new highly-automated technological sustainable solutions for deep mining … in the sea bed combined with in-situ processing of minerals”. An existing but challenging raw material resource concerns polymetallic nodules. These round to elongated concretions of 1–15 cm diameter form on sediment-covered deep-sea plains in all oceans between 4-6000m water depth. The challenge to harvest and transport the nodules to the EU shore is taken on by Blue Nodules. The governing project principle is: industrial viability within the context of a realistic and technical, economic and environmentally balanced business case for the complete Polymetallic Nodules value chain of mining, processing and valorisation. Blue Nodules will develop and test to TRL6 maturity a new highly-automated and technologically sustainable deep sea mining system. Key features are: an annual production capability of 2 Million Tons nodules in water depths up to 6000m, in-situ processing of the nodules and intrinsic safe working conditions. Technical WPs are dedicated to subsea harvesting equipment & control technology, in-situ seafloor processing of polymetallic nodules and sea surface, land operations & processes. A dedicated WP focuses on environmental issues and on an Environmental Impact Assessment (EIA). A WP setting requirements and assessing the developed technology controls the entire work plan structure. High credibility is obtained by linking the project work to a nodule field licence owned by a project partner and located in the most promising known nodule deposit: the Clarion Clipperton Zone. The project consortium contains 14 leading industry and research partners from 9 EU member states. The project duration is 48 months, the required funding amounts to 8 Million.Status
CLOSEDCall topic
SC5-11c-2015Update Date
27-10-2022
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
H2020-EU.3.5. SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials