POWERSTEP | Full scale demonstration of energy positive sewage treatment plant concepts towards market penetration

Summary
The municipal wastewater in Europe contains a potential chemical energy of 87,500 GWh per year in its organic fraction, which is equivalent to the output of 12 large power stations. Due to the currently applied technologies and related energy loss at each process step, wastewater treatment in Europe today consumes instead the equivalent of more than 2 power stations. Many operators are thus targeting incremental energy efficiency towards energy neutrality, but recent studies have shown that with novel process schemes using existing technologies, sewage treatment plants could actually become a new source of renewable energy, without compromising the treatment performance.
The project POWERSTEP aims at demonstrating such innovative concepts in first full scale references for each essential process step in order to design energy positive wastewater treatment plants with currently available technologies. The following processes will be demonstrated in 6 full-scale case studies located in 4 European countries: enhanced carbon extraction (pre-filtration), innovative nitrogen removal processes (advanced control, main-stream deammonification, duckweed reactor), power-to-gas (biogas upgrade) with smart grid approach, heat-to-power concepts (thermoelectric recovery in CHP unit, steam rankine cycle, heat storage concepts), and innovative process water treatment (nitritation, membrane ammonia stripping). These individual technology assessments will merge into integrative activities such as treatment scheme modelling and design, global energy and heat management, carbon footprinting, integrated design options, as well as extensive dissemination activities.
POWERSTEP will demonstrate the novel concepts and design treatment schemes of wastewater treatment plants that will be net energy producers, paving the way towards large implementation of such approaches and quick market penetration and supporting the business plans of participating technology providers.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/641661
Start date: 01-07-2015
End date: 30-06-2018
Total budget - Public funding: 5 173 854,75 Euro - 3 997 125,00 Euro
Cordis data

Original description

The municipal wastewater in Europe contains a potential chemical energy of 87,500 GWh per year in its organic fraction, which is equivalent to the output of 12 large power stations. Due to the currently applied technologies and related energy loss at each process step, wastewater treatment in Europe today consumes instead the equivalent of more than 2 power stations. Many operators are thus targeting incremental energy efficiency towards energy neutrality, but recent studies have shown that with novel process schemes using existing technologies, sewage treatment plants could actually become a new source of renewable energy, without compromising the treatment performance.
The project POWERSTEP aims at demonstrating such innovative concepts in first full scale references for each essential process step in order to design energy positive wastewater treatment plants with currently available technologies. The following processes will be demonstrated in 6 full-scale case studies located in 4 European countries: enhanced carbon extraction (pre-filtration), innovative nitrogen removal processes (advanced control, main-stream deammonification, duckweed reactor), power-to-gas (biogas upgrade) with smart grid approach, heat-to-power concepts (thermoelectric recovery in CHP unit, steam rankine cycle, heat storage concepts), and innovative process water treatment (nitritation, membrane ammonia stripping). These individual technology assessments will merge into integrative activities such as treatment scheme modelling and design, global energy and heat management, carbon footprinting, integrated design options, as well as extensive dissemination activities.
POWERSTEP will demonstrate the novel concepts and design treatment schemes of wastewater treatment plants that will be net energy producers, paving the way towards large implementation of such approaches and quick market penetration and supporting the business plans of participating technology providers.

Status

CLOSED

Call topic

WATER-1a-2014

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.5. SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials
H2020-EU.3.5.4. Enabling the transition towards a green economy and society through eco-innovation
H2020-EU.3.5.4.0. Cross-cutting call topics
H2020-WATER-2014-two-stage
WATER-1a-2014 First application and market replication