Fortissimo 2 | Factories of the Future Resources, Technology, Infrastructure and Services for Simulation and Modelling 2

Summary

Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth. The importance of advanced ICT to the competitiveness of both large and small companies in the engineering and manufacturing domain is well established. Despite early successes in this area, there are still many barriers to the uptake of such solutions, not least of which are the initial cost and complexity of adoption, particularly in the context of challenging trading conditions.

This project targets the ICT Innovation for Manufacturing SMEs (I4MS) action line (Phase 2) and builds on Phase 1 of that initiative. Phase 2 addresses the adoption of next generation ICT advances in the manufacturing domain. At the core of Fortissimo 2 are three tranches of Application Experiments (~35 in total).

An initial set is included in this proposal and two further sets will be obtained through Open Calls for proposals. These experiments will be driven by the requirements of first-time users (predominately SMEs) and will bring together actors from across the value chain, from cycle providers to domain experts via the Fortissimo Marketplace. This will enable innovative solutions to manufacturing challenges, leading to new and improved design processes, products and services.

A key feature of Fortissimo 2 will be the adaption of the Marketplace to meet the needs of end-users. It will offer a responsive and reliable service to companies which want to access HPC and Big resources and expertise. Fortissimo 2 initially involves 732 months of effort, a total cost of €11.1m and EC funding of €10m over a duration of three years, commensurate with achieving its ambitious goals.

Unfold all
/
Fold all
More information & hyperlinks
Web resources: http://www.fortissimo-project.eu
https://cordis.europa.eu/project/id/680481
Start date: 11-01-2015
End date: 31-12-2018
Total budget - Public funding: 10 000 000,00 Euro - 9 999 776,00 Euro
View on other portals
Cordis data

Original description

Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.

The importance of advanced ICT to the competitiveness of both large and small companies in the engineering and manufacturing domain is well established. Despite early successes in this area, there are still many barriers to the uptake of such solutions, not least of which are the initial cost and complexity of adoption, particularly in the context of challenging trading conditions. This proposal targets the ICT Innovation for Manufacturing SMEs (I4MS) action line (Phase 2) and builds on Phase 1 of that initiative.

Phase 2 addresses the adoption of next generation ICT advances in the manufacturing domain. At the core of Fortissimo 2 are three tranches of Application Experiments (~35 in total). An initial set is included in this proposal and two further sets will be obtained through Open Calls for proposals. These experiments will be driven by the requirements of first-time users (predominately SMEs) and will bring together actors from across the value chain, from cycle providers to domain experts via the Fortissimo Marketplace. This will enable innovative solutions to manufacturing challenges, leading to new and improved design processes, products and services. A key feature of Fortissimo 2 will be the adaption of the Marketplace to meet the needs of end-users. It will offer a responsive and reliable service to companies which want to access HPC and Big resources and expertise.

Fortissimo 2 initially involves 732 months of effort, a total cost of €11.1m and EC funding of €10m over a duration of three years, commensurate with achieving its ambitious goals.

Status

CLOSED

Call topic

FoF-09-2015

Update Date

27-10-2022
Images
5b5a0b6ae1c91.png
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Factories of the Future Partnership (FoF) - Made in Europe Partnership (MiE)
H2020 - Factories of the Future
H2020-FoF-2015
FoF-09-2015 ICT Innovation for Manufacturing SMEs (I4MS)
Horizon 2020
H2020-EU.2. INDUSTRIAL LEADERSHIP
H2020-EU.2.1. INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies
H2020-EU.2.1.1. INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)
H2020-EU.2.1.1.0. INDUSTRIAL LEADERSHIP - ICT - Cross-cutting calls
H2020-FoF-2015
FoF-09-2015 ICT Innovation for Manufacturing SMEs (I4MS)
H2020-EU.2.1.5. INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Advanced manufacturing and processing
H2020-EU.2.1.5.1. Technologies for Factories of the Future
H2020-FoF-2015
FoF-09-2015 ICT Innovation for Manufacturing SMEs (I4MS)