YURAKAN | HIGH POWER CYCLONE CONVERTER GENERATOR FOR WIND ONSHORE

Summary
Wind is an inexhaustible source of energy with potential to supply 20 times more power than what the entire human
population needs, and it has already surpassed any other source of renewable energy reaching 452 GW in 2016 of onshore
power installed capacity, which is forecasted to grow up to 922 GW in 2030 -6.7% of the world’s power consumption. Yet,
current technology requires to employ huge blades to obtain more energy. This is not efficient and safe as they need high
initial investment in the turbines manufacturing, transportation and ground works and a major portion of land, which
increases the rental costs and can displace farming from fertile land. Also, the blades are prone to erosion, requiring costly
operation maintenance and they can be a safety hazard to the people working in these wind farms when submitted to
tornados or hurricanes.
Our CCG technology is based on the concept of a packed and controlled cyclone inside a hollow tower, which rotates the
turbine blades on the top of the structure. In this way a CCG 30 MW unit (15x more than the most common turbines)
occupies 30x less space. Our CCG solution is simple and easy to build, consisting of a turbine generator and a reinforced
concrete structure, it can be installed using current road ways. Thanks to these features, CCG can be installed in onshore
locations, where winds >30 m/s, may occur. It will reduce by 50% energy costs compared with conventional horizontal-axis
wind turbines, i.e. LCOE (0.02-0.03 €/kW) CAPEX (750-950 €/kW)
Our target market will be existing onshore wind farms for repowering and planned wind farms, i.e. > 900 GW in 2022.
Thanks to the uniqueness of CCG, we expect to get at least a 1% penetration in the wind energy sector by 2024, which
means over 1 GW capacity installed with our technology and a ROI of 9.8. After testing the first prototype, to evaluate the
best market entry we need to perform a detailed feasibility study for what we are asking for support from the EC.
Results, demos, etc. Show all and search (1)
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/807460
Start date: 01-03-2018
End date: 31-07-2018
Total budget - Public funding: 71 429,00 Euro - 50 000,00 Euro
Cordis data

Original description

Wind is an inexhaustible source of energy with potential to supply 20 times more power than what the entire human
population needs, and it has already surpassed any other source of renewable energy reaching 452 GW in 2016 of onshore
power installed capacity, which is forecasted to grow up to 922 GW in 2030 -6.7% of the world’s power consumption. Yet,
current technology requires to employ huge blades to obtain more energy. This is not efficient and safe as they need high
initial investment in the turbines manufacturing, transportation and ground works and a major portion of land, which
increases the rental costs and can displace farming from fertile land. Also, the blades are prone to erosion, requiring costly
operation maintenance and they can be a safety hazard to the people working in these wind farms when submitted to
tornados or hurricanes.
Our CCG technology is based on the concept of a packed and controlled cyclone inside a hollow tower, which rotates the
turbine blades on the top of the structure. In this way a CCG 30 MW unit (15x more than the most common turbines)
occupies 30x less space. Our CCG solution is simple and easy to build, consisting of a turbine generator and a reinforced
concrete structure, it can be installed using current road ways. Thanks to these features, CCG can be installed in onshore
locations, where winds >30 m/s, may occur. It will reduce by 50% energy costs compared with conventional horizontal-axis
wind turbines, i.e. LCOE (0.02-0.03 €/kW) CAPEX (750-950 €/kW)
Our target market will be existing onshore wind farms for repowering and planned wind farms, i.e. > 900 GW in 2022.
Thanks to the uniqueness of CCG, we expect to get at least a 1% penetration in the wind energy sector by 2024, which
means over 1 GW capacity installed with our technology and a ROI of 9.8. After testing the first prototype, to evaluate the
best market entry we need to perform a detailed feasibility study for what we are asking for support from the EC.

Status

CLOSED

Call topic

SMEInst-09-2016-2017

Update Date

27-10-2022
Images
No images available.