Summary
CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/662782
Start date: 01-03-2015
End date: 30-06-2015
Total budget - Public funding: 71 429,00 Euro - 50 000,00 Euro
Cordis data

Original description

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Status

CLOSED

Call topic

SIE-01-2014-1

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.2. INDUSTRIAL LEADERSHIP
H2020-EU.2.3. INDUSTRIAL LEADERSHIP - Innovation In SMEs
H2020-EU.2.3.1. Mainstreaming SME support, especially through a dedicated instrument
H2020-SMEINST-1-2014
SIE-01-2014-1 Stimulating the innovation potential of SMEs for a low carbon energy system
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.3. SOCIETAL CHALLENGES - Secure, clean and efficient energy
H2020-EU.3.3.0. Cross-cutting call topics
H2020-SMEINST-1-2014
SIE-01-2014-1 Stimulating the innovation potential of SMEs for a low carbon energy system