VSM | Validated Surge Model

Summary
Filton Systems Engineering (FSE) intends to establish methodologies, which have been verified using test data, to provide validated accurate surge pressure predictions within aircraft fuel systems. This would replace physical Aerospace Test Rigs with a virtual test rig to reduce development cost and lead-time by improving the robustness/integrity of surge/ two phase flow fluid modelling. This allows aerospace companies to optimise architecture early in the design phase minimising installation and structural weight, increasing aircraft efficiency, thereby lowering operating cost and also reducing carbon footprint.
Commercial realisation of the programme is through the sale of services/methodologies to aerospace customers and also potentially through the sale of validation test data to software houses to improve their marketing position relative to claims for predicting surge pressures; and the expansion of methodologies to cover fluid applications in other industries.
FSE is uniquely positioned to succeed within this task due to existing surge analysis, test management and rig specification capabilities which will also protect further work that develop from this programme of work.
The feasibility study undertaken under Phase 1 will comprise:
1. IP investigation
a. Current IP for similar methodologies
b. Use of IP to protect methodologies
c. Use of copyright to protect data
2. Potential commercial arrangements with final customers
a. Requirements
b. Use of data, services & methodologies
3. Potential commercial arrangements with software house
a. Support for commercial code
b. Use of validation test data
4. Statement of Work for Phase 2 (inc. plan & budget)
5. Top level test facility requirements
6. Top level test requirements
7. Produce Comprehensive Feasibility Report
If Phase 1 is successful, further funding will be applied for under Horizon 2020 Phase 2 with FSE providing the balance of the funding. It is estimated that Phase 2 will take a further 2½ years.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/650854
Start date: 01-10-2014
End date: 31-03-2015
Total budget - Public funding: 71 429,00 Euro - 50 000,00 Euro
Cordis data

Original description

Filton Systems Engineering (FSE) intends to establish methodologies, which have been verified using test data, to provide validated accurate surge pressure predictions within aircraft fuel systems. This would replace physical Aerospace Test Rigs with a virtual test rig to reduce development cost and lead-time by improving the robustness/integrity of surge/ two phase flow fluid modelling. This allows aerospace companies to optimise architecture early in the design phase minimising installation and structural weight, increasing aircraft efficiency, thereby lowering operating cost and also reducing carbon footprint.
Commercial realisation of the programme is through the sale of services/methodologies to aerospace customers and also potentially through the sale of validation test data to software houses to improve their marketing position relative to claims for predicting surge pressures; and the expansion of methodologies to cover fluid applications in other industries.
FSE is uniquely positioned to succeed within this task due to existing surge analysis, test management and rig specification capabilities which will also protect further work that develop from this programme of work.
The feasibility study undertaken under Phase 1 will comprise:
1. IP investigation
a. Current IP for similar methodologies
b. Use of IP to protect methodologies
c. Use of copyright to protect data
2. Potential commercial arrangements with final customers
a. Requirements
b. Use of data, services & methodologies
3. Potential commercial arrangements with software house
a. Support for commercial code
b. Use of validation test data
4. Statement of Work for Phase 2 (inc. plan & budget)
5. Top level test facility requirements
6. Top level test requirements
7. Produce Comprehensive Feasibility Report
If Phase 1 is successful, further funding will be applied for under Horizon 2020 Phase 2 with FSE providing the balance of the funding. It is estimated that Phase 2 will take a further 2½ years.

Status

CLOSED

Call topic

IT-1-2014-1

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.2. INDUSTRIAL LEADERSHIP
H2020-EU.2.3. INDUSTRIAL LEADERSHIP - Innovation In SMEs
H2020-EU.2.3.1. Mainstreaming SME support, especially through a dedicated instrument
H2020-SMEINST-1-2014
IT-1-2014-1 Small business innovation research for Transport
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.0. Cross-cutting call topics
H2020-SMEINST-1-2014
IT-1-2014-1 Small business innovation research for Transport