Nano-Edison | The most viable stationary energy storage solution for grid applications

Summary
Increasing share of renewable energy (solar and wind) into the EU energy mix is posing new grid management problems for operators. As the share exceeds 25%, it causes high levels of grid instability that can lead to supply insecurity and outages. As a result, EU electricity distribution operators will require €480 billion by 2035 to expand their networks to overcome challenges associated with integrating renewables if cost and service life of current energy storage technologies are not improved. The only two energy storage methods that have acceptable cost and life: pumped hydro-storage (PHS) and compressed air energy storage (CAES) do not have the required rapid response times and are severely limited by geographic restrictions. While battery energy storage (BES) systems have the required instantaneous response, current technologies are prohibitively expensive and have limited lifespans and have safety risks.

In response to this, Greenvolt Nanoma ehf, an Icelandic company uses nanotechnology to develop the first ever BES technology to meet all performance and cost criteria for grid applications. Our Nano-Edison battery’s costs and service life are comparable to PHS and CAES. Our solution is also tolerant to heavy currents, overcharging/discharging and even short circuits and can support pulse charging – making it ideal for capturing variable renewable energies.

As such, we have a unique advantage within the rapidly growing €7.34 billion global market for grid-scale battery storage. With a viable technology that enables grid operators to defer investments in costly network expansion, we seek to be the global leader in energy storage for stationary applications. We have estimated that we will need an additional investment of €3.5 million to achieve that and bring our technology to the market.
Results, demos, etc. Show all and search (1)
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/876806
Start date: 01-08-2019
End date: 30-11-2019
Total budget - Public funding: 71 429,00 Euro - 50 000,00 Euro
Cordis data

Original description

Increasing share of renewable energy (solar and wind) into the EU energy mix is posing new grid management problems for operators. As the share exceeds 25%, it causes high levels of grid instability that can lead to supply insecurity and outages. As a result, EU electricity distribution operators will require €480 billion by 2035 to expand their networks to overcome challenges associated with integrating renewables if cost and service life of current energy storage technologies are not improved. The only two energy storage methods that have acceptable cost and life: pumped hydro-storage (PHS) and compressed air energy storage (CAES) do not have the required rapid response times and are severely limited by geographic restrictions. While battery energy storage (BES) systems have the required instantaneous response, current technologies are prohibitively expensive and have limited lifespans and have safety risks.

In response to this, Greenvolt Nanoma ehf, an Icelandic company uses nanotechnology to develop the first ever BES technology to meet all performance and cost criteria for grid applications. Our Nano-Edison battery’s costs and service life are comparable to PHS and CAES. Our solution is also tolerant to heavy currents, overcharging/discharging and even short circuits and can support pulse charging – making it ideal for capturing variable renewable energies.

As such, we have a unique advantage within the rapidly growing €7.34 billion global market for grid-scale battery storage. With a viable technology that enables grid operators to defer investments in costly network expansion, we seek to be the global leader in energy storage for stationary applications. We have estimated that we will need an additional investment of €3.5 million to achieve that and bring our technology to the market.

Status

CLOSED

Call topic

EIC-SMEInst-2018-2020

Update Date

27-10-2022
Images
No images available.
Geographical location(s)