Summary
The safe connection between the concrete piles and the pile cap is crucial for the stability of a construction project, especially for heavy structures as bridges and high-rise buildings and/or projects in non-cohesive soils (sand, gravel, water). Damaging the reinforcement bars during the pile head removal can result in high financial loss, time waste and therefore, danger for the overall construction safety. Today’s solutions cannot guarantee a secure and efficient pile head removal, as they all apply vertical forces endangering the concrete structure. On top of that, high amounts of energy are lost during the operation and OPEX is very high.
With Brextor we want to revolutionize the construction industry, by offering an innovative concrete pile milling head which applies horizontal forces to the pile and can thus control 100% the applied energy for an accurate and secure pile head removal minimizing the energy loss. Moreover, our method can guarantee an up to 4 times faster pile breaking at an up to 3.5 times lower OPEX. We also minimize the human risk factor as minimum worker intervention is required. We started working on Brextor since 2007, and our current prototype has attracted the interest of the largest Swiss construction companies, having already used the first version of our technology in >100 sites in the country, including important construction as the Roche Tower in Basel in 2018. It has also been pilot used in Germany and Philippines.
We will sell Brextor to construction companies and building contractors via direct sales for the Swiss region and distributors. With an additional investment of €2.5 million, we aim to sell ~1,100 units in a 5-year period (2022-2026) creating a business opportunity of €81.5 million and generating an astonishing ROI2026 of 5.52
With Brextor we want to revolutionize the construction industry, by offering an innovative concrete pile milling head which applies horizontal forces to the pile and can thus control 100% the applied energy for an accurate and secure pile head removal minimizing the energy loss. Moreover, our method can guarantee an up to 4 times faster pile breaking at an up to 3.5 times lower OPEX. We also minimize the human risk factor as minimum worker intervention is required. We started working on Brextor since 2007, and our current prototype has attracted the interest of the largest Swiss construction companies, having already used the first version of our technology in >100 sites in the country, including important construction as the Roche Tower in Basel in 2018. It has also been pilot used in Germany and Philippines.
We will sell Brextor to construction companies and building contractors via direct sales for the Swiss region and distributors. With an additional investment of €2.5 million, we aim to sell ~1,100 units in a 5-year period (2022-2026) creating a business opportunity of €81.5 million and generating an astonishing ROI2026 of 5.52
Unfold all
/
Fold all
More information & hyperlinks
Web resources: | https://cordis.europa.eu/project/id/868136 |
Start date: | 01-05-2019 |
End date: | 31-08-2019 |
Total budget - Public funding: | 71 429,00 Euro - 50 000,00 Euro |
Cordis data
Original description
The safe connection between the concrete piles and the pile cap is crucial for the stability of a construction project, especially for heavy structures as bridges and high-rise buildings and/or projects in non-cohesive soils (sand, gravel, water). Damaging the reinforcement bars during the pile head removal can result in high financial loss, time waste and therefore, danger for the overall construction safety. Today’s solutions cannot guarantee a secure and efficient pile head removal, as they all apply vertical forces endangering the concrete structure. On top of that, high amounts of energy are lost during the operation and OPEX is very high.With Brextor we want to revolutionize the construction industry, by offering an innovative concrete pile milling head which applies horizontal forces to the pile and can thus control 100% the applied energy for an accurate and secure pile head removal minimizing the energy loss. Moreover, our method can guarantee an up to 4 times faster pile breaking at an up to 3.5 times lower OPEX. We also minimize the human risk factor as minimum worker intervention is required. We started working on Brextor since 2007, and our current prototype has attracted the interest of the largest Swiss construction companies, having already used the first version of our technology in >100 sites in the country, including important construction as the Roche Tower in Basel in 2018. It has also been pilot used in Germany and Philippines.
We will sell Brextor to construction companies and building contractors via direct sales for the Swiss region and distributors. With an additional investment of €2.5 million, we aim to sell ~1,100 units in a 5-year period (2022-2026) creating a business opportunity of €81.5 million and generating an astonishing ROI2026 of 5.52
Status
CLOSEDCall topic
EIC-SMEInst-2018-2020Update Date
27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all