5G EVE | 5G European Validation platform for Extensive trials

Summary
We are at the “eve” of a fundamental transition in 5G, and the aspiration of 5G-EVE is to create the foundations for a pervasive roll-out of end-to-end 5G networks in Europe.
5G-EVE supports this fundamental transition by offering to vertical industries and to all 5GPPP Phase3 projects facilities to validate their network KPIs and their services.
Important representatives of these vertical industries are directly involved as partners of 5G-EVE exactly to influence the design of the end-to-end 5G services, and to provide an early assessment.

The 5G-EVE end-to-end facility consists of the interconnection of four 5G-site-facilities (France, Spain, Italy, Greece), which have been selected because of their considerable previous work with vertical industries and standardisation bodies, on top of their 5G technology competences.
5G-EVE aims at creating synergies between a significant number of facilities that will ensure sustainability and impact in terms of exploitation.

The 5G-EVE facility will enable experiments with: (a) heterogeneous access, including NR, licensed/unlicensed spectrum, advanced spectrum management; (b) Mobile Edge Computing, backhaul, core/service technologies; (c) means for site-interworking and multi-site/domain/technology slicing/orchestration.
5G-EVE will be initially compliant with 3GPP Rel. 15 and, later on, with Rel. 16.

Industrial verticals will be facilitated in the specification/analysis of experiments through: (a) intent-based, and other high-level, interfaces; (b) means for advanced 5G testing, i.e., for KPI analysis, technology benchmarking, performance diagnosis. A VNF pool, including open source and proprietary, radio/network/service, components will be developed and made available.

5G-EVE will impact standards, and has the potential and strategy for ensuring the sustainability of the facility beyond the project lifetime, therefore becoming a cornerstone of the 5G PPP programme and beyond.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/815074
Start date: 01-07-2018
End date: 30-06-2021
Total budget - Public funding: 15 742 222,50 Euro - 15 737 785,00 Euro
Cordis data

Original description

We are at the “eve” of a fundamental transition in 5G, and the aspiration of 5G-EVE is to create the foundations for a pervasive roll-out of end-to-end 5G networks in Europe.
5G-EVE supports this fundamental transition by offering to vertical industries and to all 5GPPP Phase3 projects facilities to validate their network KPIs and their services.
Important representatives of these vertical industries are directly involved as partners of 5G-EVE exactly to influence the design of the end-to-end 5G services, and to provide an early assessment.

The 5G-EVE end-to-end facility consists of the interconnection of four 5G-site-facilities (France, Spain, Italy, Greece), which have been selected because of their considerable previous work with vertical industries and standardisation bodies, on top of their 5G technology competences.
5G-EVE aims at creating synergies between a significant number of facilities that will ensure sustainability and impact in terms of exploitation.

The 5G-EVE facility will enable experiments with: (a) heterogeneous access, including NR, licensed/unlicensed spectrum, advanced spectrum management; (b) Mobile Edge Computing, backhaul, core/service technologies; (c) means for site-interworking and multi-site/domain/technology slicing/orchestration.
5G-EVE will be initially compliant with 3GPP Rel. 15 and, later on, with Rel. 16.

Industrial verticals will be facilitated in the specification/analysis of experiments through: (a) intent-based, and other high-level, interfaces; (b) means for advanced 5G testing, i.e., for KPI analysis, technology benchmarking, performance diagnosis. A VNF pool, including open source and proprietary, radio/network/service, components will be developed and made available.

5G-EVE will impact standards, and has the potential and strategy for ensuring the sustainability of the facility beyond the project lifetime, therefore becoming a cornerstone of the 5G PPP programme and beyond.

Status

CLOSED

Call topic

ICT-17-2018

Update Date

27-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.2. INDUSTRIAL LEADERSHIP
H2020-EU.2.1. INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies
H2020-EU.2.1.1. INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)
H2020-EU.2.1.1.0. INDUSTRIAL LEADERSHIP - ICT - Cross-cutting calls
H2020-ICT-2018-1
ICT-17-2018 5G End to End Facility