CONNECTA | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. 01-09-2016 - 30-09-2018 Show more information EU-Programme-Call Horizon 2020 H2020-EU.3. SOCIETAL CHALLENGES H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport H2020-EU.3.4.8. Shift2Rail JU H2020-EU.3.4.8.1. Innovation Programme 1 (IP1): Cost-efficient and reliable trains H2020-S2RJU-CFM-2016-01-1 S2R-CFM-IP1-02-2016 Development of new technological concepts, standard specifications and architectures for train control and monitoring, with specific applications in train-to-ground communications and high safety electronic control of brakes
PINTA | IP1 Traction TD1 and Brakes TD5 – Phase 1 01-09-2016 - 31-12-2018 Show more information EU-Programme-Call Horizon 2020 H2020-EU.3. SOCIETAL CHALLENGES H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport H2020-EU.3.4.8. Shift2Rail JU H2020-EU.3.4.8.1. Innovation Programme 1 (IP1): Cost-efficient and reliable trains H2020-S2RJU-CFM-2016-01-1 S2R-CFM-IP1-01-2016 Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion