CONNECTA-2 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. 01-10-2018 - 31-07-2021 Show more information EU-Programme-Call Horizon 2020 H2020-EU.3. SOCIETAL CHALLENGES H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport H2020-EU.3.4.8. Shift2Rail JU H2020-EU.3.4.8.1. Innovation Programme 1 (IP1): Cost-efficient and reliable trains H2020-S2RJU-CFM-2018 S2R-CFM-IP1-02-2018 Implementing new technologies for the TCMS
PINTA2 | IP1 Traction TD1 and Brakes TD5 – Phase 2 01-09-2018 - 28-02-2021 Show more information EU-Programme-Call Horizon 2020 H2020-EU.3. SOCIETAL CHALLENGES H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport H2020-EU.3.4.8. Shift2Rail JU H2020-EU.3.4.8.1. Innovation Programme 1 (IP1): Cost-efficient and reliable trains H2020-S2RJU-CFM-2018 S2R-CFM-IP1-01-2018 Development of technology demonstrators for the next generation of traction systems and adhesion management systems