First evaluation report for the testing in controlled environments

Summary
This first evaluation report will describe the results of the following testing: At M12 the deployment of the tools will occur in the test lab of SmH. The testing of the tools in the controlled environment of SmH will last up to M16. Further reporting of the laboratory testing, following the methodology defined in T6.1 will be developed in the context of T6.5 and will be used as input for T2.3, in time to be integrated in D2.3.