Synthesis report: Discrepancies between ES needs and ES outputs under current FMMs

Summary
A baseline simulation of the activities and ES outcomes over time (typically around 100 years) will be made, based on current FMMs and management principles. This feeds into WP4 (workshop round 1) and also serves as a check of DSS reliability. The simulations are to be provided for each landscape based on set framework conditions from WP2 and combinations of existing FMMs from WP1 (T1.2). Under the coordination of the WP3 leader, the landscape case analyses are to be synthesized into a report on FMM use and ES outputs, using standardized formats allowing for a comparison between cases of FMM application and ES delivery for different framework conditions at the landscape level. (The Netherlands and Italy produce the same type of material as the other cases, though with the methodology implicated under T3.1).