Summary
Optimization of the reactive power dispatch between the wind turbines so that the total losses are minimized.
The deliverable is referring to task 2.3.
Measure of Success: Optimization of WPP set points conditioned on grid demands and operating conditions.
Participant actions: DTU is solely responsible.
More information & hyperlinks