Optimization of reactive power dispatch

Summary
Optimization of the reactive power dispatch between the wind turbines so that the total losses are minimized. The deliverable is referring to task 2.3. Measure of Success: Optimization of WPP set points conditioned on grid demands and operating conditions. Participant actions: DTU is solely responsible.