Optimization of WPP set-points

Summary
Device set-points reflecting the optimal balance between WPP power production and cost of WPP loading from an economic perspective, and further to explore the sensitivity of model fidelity on resulting control schemes. The deliverable is referring to the overall task 2.2, incl. the subtasks 2.2.1, 2.2.2, 2.2.3, and 2.2.4. Measure of Success: Successful inclusion of the load aspect in development of optimized WPP control schemes. Participant actions: DTU is responsible for the medium fidelity and low fidelity models, KUL and DNV are responsible for the low fidelity models, and STATOIL is responsible for the load mitigation in various met-ocean conditions.