Report on the System Prototype Implemented in the Field - Use Case 3

Summary
Document D_9_3 provides the results of prototype installations. Basis for D_9_3 is the requirement and test specification developed during “WP 9 – Requirement Analysis” and documented in D_9_1. Problems might arise if equipment / deliverable is not ready for “Move-in” (MVIN) or does not pass “Site-Acceptance-Test” (SAT). Reasons to fail SAT might stem from security or safety issues or the risk of losing prosumer support due to non-performance issues.