Summary
Deliverable D.3.4 refers to Task 3.3 / “Development of complete cable with novel outer armouring” and involves the production of a complete 66 kV dynamic submarine cable sample as depicted in Figure 3.7. The complete cable will be produced in FULGOR manufacturing facilities with the exception of the braided armour which will be applied at ITA RWTH facilities, and will be verified according to FULGOR specifications (i.e. produced length, cross section, insulation thickness and other dimensional checks, DC resistance of conductor, routine voltage test, partial discharge test and other electrical/non electrical and mechanical tests such as referred in Subtask D.5.3.2) and a report will be issued as described in Subtask D.5.7. The complete cable will also be used for Subtask 5.3.1 / “Mechanical power cable testing” and 5.3.3 / “Hydrodynamic testing of the cable” and reports will be issued as described in Subtasks D.5.6 and D.5.5 respectively.
Linked to T3.3 Development of complete cable with novel outer armouring.
More information & hyperlinks