Summary
Based on the work resulting in deliverable D8.1, D8.2, D8.3, D8.4 and D8.5 the feasibility of LOHC will be presented in this final feasibility study. The scale-dependent break-even point in terms of overall costs (CAPEX and OPEX) will be calculated and the thresholds and bottlenecks of the whole LOHC hydrogen logistics concept will be defined.
More information & hyperlinks