Summary
In D8.1 the technical requirement regarding and the defined test cases for the demonstration of flexibility measures and electricity grid services provided by local energy storage and EVs will be described. In addition, the successful integration of the required equipment in the test-sites will be documented in detail. Finally, the adequate determination of the required data sets for the integration of the IoT platform will be evaluated. The expected outcome of D8.1 is the verification that the test-sites have successfully integrated all the necessary equipment and are ready for the required demonstrations. D8.1 corresponds to the activities of Task 8.1.