Cost effective conservation and restoration methods

Summary
Following the approach of D1.2, this deliverable will also have two releases: the first at M12 and the second at M36, after feedback from the experimentation is available) In this deliverable, existing restoration and conservation methodologies will be reported, together with an analysis of cost-effectiveness. Long term expected results for each described method will be presented and, where possible, compared simulating the STORM experimental sites situation.