Summary
Reports D2.2, D2.3, D2.4 and D2.5: WECs descriptions with restrictions. PTO base cases characteristics. These reports will include the information from WEDGE, CORPOWER, CENTIPOD and HYDROCAP respectively (each company is responsible entity of its part). M8 and updated in M33.
Based on the POM developed in WP1.1, and parametrized for each of the WEC devices with their characteristics and control strategy in WP1.2, WavEC will carry out a set of calculations for each of the 8 test scenarios in order to evaluate the improvement achieved in each case with the new PTO solution, following the procedure outlined in the modelling analysis methodology