Summary
A report will be delivered to fulfil the call deliverable 1b), identifying the power requirements of the on-board energy harvester technologies, as defined by the communications specifications defined in T3.1 and T3.2. This report will contain a description of the power requirements (harvesting, storing, supplying) of the lowest power method capable of achieving train integrity as specified in T2.1, as well as also describing other methods where the power required is within that which is potentially available as predicted in T4.2. This report will include a description of the operating parameters of the test platform and the output of the FMEA.
More information & hyperlinks