ATO over ETCS GoA3/4 Feasibility Study and preliminary specification

Summary
This deliverable from Task 4.6 and 4.7 will include: -the feasibility study including identified hazards and their proposed mitigations and the proposal of modifications to the operational concepts; -preliminary System Requirements and Architecture of the overall ATO over ETCS; -the identification of the impacts on the current ERTMS specification.