WP3 GoA3/4 Specification

Summary
This includesDraft of Operational Requirements includes GoA12Draft of System Requirement Specification for ATO up to GoA4 Fully functional and vendor independentDraft of Physical Architecture SpecificationDraft of Safety AnalysisFurther SpecificationsObstacle detectionPassenger Exchange door openingclosing safe departureIncident Emergency detection and managementLocalisation from TD24Remote Control including degraded modesGoA34 Specification will be submitted to IP5 TD513 members in order to consider specific freight requirement In addition one representative of IP5 TD513 will always be invited in WP4 meetings