Summary
The D4.9 will correspond to the technical and legal evaluation of the revised prototypes with improved sensing subsystem developed in WP4. This deliverable will include the results from T4.8 and T4.9.
Responsible: BKA (2PM), CFLP (1PM), TiU (0.5PM), CS (0.5PM), UCBL (2PM).
More information & hyperlinks