4 Pilots built + Feedback report

Summary
Description: For 4 pilots the finalised construction will be submitted as a deliverable, taking into account the results and feedback from the feasibility report and the prototyping. The objectives of the pilot that were studied theoretically in the feasibility report as well as through prototyping will be applied in the building of the pilots. The construction of the pilots will demonstrate how to implement reversible design and materials passports in dynamic and circular buildings. The report on the construction of the pilots and feedback will be structured around 4 chapters, each representing the built pilot and feedback report for one pilot site. Each chapter will address: • Construction drawings: as built plans (of each transformation/relocation. • Specifications of materials: how and why to use in the construction. • Technical specifications and details that provide information about the components which determine the reversibility and implementation of Materials Passports. • Pictures of the building activities, taken during the important phases of the project (photos that capture both the elements which determine the reversibility, waste reduction, and implementation of materials passports) • Assessment of the applied financial/economical aspects of the pilot built. • Assessment of the transformations/relocations: conclusions on the consequences on technical, architectural, economical, comfort… level. Conclusions on the ease of use, needed time and logistical implications. Feedback report on the pilots built concerning the lessons learned, analysis of the process, feedback to WP2-WP3-WP5