Summary
System design and preliminary specifications [SAV; M6]:
- This deliverable will include the results of T2.1. including the container design and architecture, list of materials and component and flow diagrams.
-The information on this deliverable will be the basis for T2.2. to 2.7. and WP3.
More information & hyperlinks