Summary
General architecture of the collection and transport system: User/ system requirements [ITENE, M4].
-This deliverable will be based on the result of WP2 and the initial expectations defined in T3.1. and T3.3.
- It will be a report describing the general architecture of the system as well as the requirements of users and the system in general. This document will guide the work within the WP.
-This deliverable will be the basis for all the tasks of the WP (T3.1. to T3.5).
More information & hyperlinks