Summary
Updates to D2.8 following CIDER amendments and will reflect the changes in the platform, as presented in the amended work package description (M35)
D2.8:
OSCPSEP releases (Prototype, M24)
This deliverable feeds into Task 2.6 Overall System integration and technical testing of demonstrator applications (Leader: AUTH, Duration: M7-M36)
The first step towards the integration of the OSCPSEP modules will be the consolidation of the input from the requirements analysis performed in T2.1, as well as the design of the individual components and the overall architecture. Task 2.6 will initially provide both the generic guidelines for the development of the modules, as well as the exact integration tests for the early and final modules.
One of the main outcomes of this task will be the successful release of the early and final OSCPSEP platform versions. The early OSCPSEP platform will serve as a benchmark for deploying the early pilot prototypes and will serve as input for the final specifications of the platform, while the final OSCPSEP platform will be used for the full implementation of the pilot cases, as specified in WP4. The final platform will also incorporate the guidelines for the co-design methodology to be fostered. Two OSCPSEP prototypes will be released.
Using the released platform versions, T2.6 will perform a phased deployment of prototype applications & front-end components developed under T4.2 and T4.3 across the four European trial sites. Before the pilot applications can be evaluated with end-users at the field sites (T3.6) an overall integration test will be carried out including assessment of data availability, front-end and back-end functionality and usability aspects. This way functionality will be aligned and user interfaces will be fine-tuned.
AUTH will uptake this task with UPM, TT, FTB and ULANC participating.