Milichannel reactor design and evaluation for WP3 (TRL6)

Summary
TEC will report on the design and construction of multichannel millireactors Task 26 building on the result of Task 25 Two or three multichannel reactor prototypes will be constructed and validated at relevant operational conditions to assure the optimal design at TRL 6 is delivered to WP3 for the process integration an intensification