Assessment of the existing monitoring and control infrastructure and guidelines for THUMBS-UP Integration

Summary
This report compiles the results of Task 11 and 12 integrating an analysis of the existing monitoring systems of demo and validation sites including a preliminary simulation to confirm the size of the TES solutions Besides the deliverable includes an analysis of the modifications needed to implement in CARTIF III in order to allow the integration of TES systems to be validated Finally a set of guidelines about existing regulations and health and safety aspects with indications to minimize risks during the integration of the TES solutions in residential and terciary buildings will be included