Summary
The document will outline the structural design of the overall test facility, ISPR section, and service section FEG section as well as support platform. TAS-I, AS, AWI, and DLR-RY will contribute to the overall SMS design document by providing design details for the ISPR segment, including as a minimum: Design justification, 3D (CAD) drawings, Interface drawings and 2D engineering drawing, Parts and material list, Electrical schemes and labelling, Components datasheets. A first draft version of this document will be delivered one month before the CDR.