Initial system test report

Summary
The Initial system test report documents the initial status of the facility after the deployment at Neumayer III. The report will include a list of damages occurred during the transportation (if any), a detailed documentation about the initiation process of the facility and results from the initial subsystem tests. TAS-I will contribute to the initial system test report for the test segment dedicated to the ISPR cultivation system. The report will include: the results of post-processing of data monitoring of ISPR system performance during validation, telepresence/assistance reports of on-site ISPR system adjustments, repairing and components exchange during intermediate shut down, eventual failure analysis. TPZ will contribute to the Initial system test report through the log of all the R/T operations conducted during the campaign.